Table of Contents
Approval of Business Implementation Plan and Topographic Map Announcement for Daeyeon Station Housing Redevelopment Project
A housing project is underway in the area of 371-13, Daeyeon-dong.
This project aims to increase the number of units and contribute to regional development through redevelopment.
Interest in the current progress is gathering, and expectations regarding the project's feasibility are rising.

The Daeyeon Station Housing Redevelopment Project at 371-13, Daeyeon-dong, Nam-gu, Busan received official approval for its business implementation plan on September 25. According to this announcement, the project site covers a total area of 8,214㎡, including two buildings of apartments with structures ranging from three underground floors to 35 above-ground floors, along with neighborhood living facilities.
Less than a month after the public exhibition and announcements regarding the business implementation plan on September 10, a practical notice has been made. Positive impacts of this development on the region are expected.
This project is being carried out in a completely separate area distinct from Daeyeon-dong Housing, Daeyeon Housing, and Daeyeon1 Housing. It is important to use the correct name to avoid confusion with other housing redevelopment projects in the Daeyeon 5-dong area.
The housing supply is divided into 25㎡ for 1 unit, 59㎡ for 35 units, 75㎡ for 99 units, and 84㎡ for 69 units, with 136 units allocated for general sale. Additionally, 66 units have been assigned to members, and neighborhood living facilities have been designed to be 289㎡ in size.

At the end of 2022, Hanshin Construction was selected as the construction company for this project. It was initially planned for 212 units but was changed to 204 units during the final approval process.

A new road measuring 6m in width and 115m in length will be constructed and will be donated to the Nam-gu Office. This road is expected to make vehicle access more convenient and improve safety, significantly aiding in the enhancement of the residential environment.
The Daeyeon Station Housing Redevelopment Project is expected to leverage its advantageous location near Daeyeon Station to improve the residential environment and enhance the region's value.
Announcement No. 2025-118 by Nam-gu, Busan
Approval of Business Implementation Plan and Topographic Map Announcement for Daeyeon Station Housing Redevelopment Project
The Daeyeon Station Housing Redevelopment Project located at 371-13, Daeyeon-dong, Nam-gu, Busan is announced according to Article 29 of the Special Act on the Management of Vacant Houses and Small-Scale Housing Renovation, along with the topographic map in accordance with Article 32 of the National Land Planning and Utilization Act and Article 8 of the Basic Land Use Regulation Act as follows.
October 1, 2025
Mayor of Nam-gu, Busan
1. Type and Name of Project
a. Type: Housing Redevelopment Project
b. Name: Daeyeon Station Housing Redevelopment Project
2. Location and Area of Implementation Area
a. Location: area of 371-13, Daeyeon-dong, Nam-gu, Busan
b. Area: 8,214.0㎡ (implementation zone area 7,434.0㎡, road area 780.0㎡)
3. Name and Address of Implementer
a. Name: Daeyeon Station Housing Redevelopment Association
b. Address: 11-16, Suyeong-ro 250beongil, Nam-gu, Busan
4. Duration of Implementation: 48 months from the date of approval
5. Date of Approval of Business Implementation Plan: September 25, 2025
6. Specification of Land or Buildings to be Acquired or Used and Specification of Rights Other than Ownership: Not applicable
7. Specifications regarding Land Area, Building Coverage Ratio, Floor Area Ratio, Height, Purpose, etc.
Category | Content | Category | Content |
Land Area | 8,214.0㎡ | Building Area | 1,714.0744㎡ |
Building Coverage Ratio | 23.06% | Total Floor Area | 36,392.5954㎡ |
Floor Area Ratio | 299.21% | Maximum Height | 103.38m |
Purpose | Apartment and Neighborhood Living Facilities | Number of Floors | 3 basement floors, 35 floors above ground |
Number of Buildings | 2 buildings | Total Units | 204 units |
8. Housing Scale and Construction Plan
Supply Category | Number of Buildings | Number of Units | Number of Units by Housing Size (based on exclusive area, ㎡) | |||||
25(25.9669㎡) | 59A(59.9834㎡) | 59B(59.9977㎡) | 75(75.9824㎡) | 84A(84.9709㎡) | 84B(84.9790㎡) | |||
Total | 2 | 204 | 1 | 18 | 17 | 99 | 34 | 35 |
Sales | 2 | 204 | 1 | 18 | 17 | 99 | 34 | 35 |
Reserved | 2 | - | - | - | 2 | - | - | - |
General | 136 | 1 | 2 | 7 | 84 | 11 | 31 | - |
9. Scale and plan for allocation or holding land
Category | Number of Units | Sales Plan | Neighborhood Living Facilities (Exclusive Area㎡/Number) | |||||
25(25.9669㎡) | 59A(59.9834㎡) | 59B(59.9977㎡) | 75(75.9824㎡) | 84A(84.9709㎡) | 84B(84.9790㎡) | |||
Total | 204 | 1 | 18 | 17 | 99 | 34 | 35 | 289.5500/9 |
Members | 66 | - | 16 | 10 | 13 | 23 | 4 | 289.5500/9 |
Reserved Land | 2 | - | - | - | - | - | - | - |
General | 136 | 1 | 2 | 7 | 84 | 11 | 31 | - |
10. Details on the transfer of maintenance infrastructure
Type of Facility | Location | Scale | Remarks | ||
Width (m) | Length (m) | Area (㎡) | |||
Road 1 | Area of 347-11, Daeyeon-dong | 0.1~0.4 | 43.0 | 10.0 | Free transfer to the managing office (Nam-gu) |
Road 2 | Area of 348-14, Daeyeon-dong | 0.4 | 63.0 | 27.0 |
11. Considerations related to approvals and permits under other laws
a. Approval of business plans according to Article 15 of the Housing Act
b. Building permit according to Article 11 of the Building Act
c. Decision on urban and county management plans according to Article 30 of the National Land Planning and Utilization Act
1) Decision record on the establishment of urban planning facilities (roads)
a) Decision record on the establishment of roads
Category | Scale | Function | Length (m) | Starting Point | Ending Point | Usage Type | Main Passageway | Initial Decision Date | Remarks | |||
Grade | Type | Number | Width (m) | |||||||||
New Establishment | Local Road | 3 | 182 | 6 | Local Road | 115 | Daeyeon-dong 1665-3 | Daeyeon-dong 373-21 (Small Road 2-62) | General Road | - | - |
b) Justification for road establishment decision
Road name before change | Road name after change | Decision details | Reason for decision |
- | Small Road 3-182 | • New establishment - Width: 6m - Length: 115m | • To facilitate smooth vehicle access and prevent safety accidents due to the Daeyeon Station Housing Redevelopment Project, the decision was made for urban management planning (facility: road) now. |
Other related documents are omitted.
According to Article 8 of the Basic Land Use Regulation Act, topographic maps can be checked on the Land Connection website. (http://www.eum.go.kr)



Category
Announcement
Agency Category
District
Agency
Nam-gu
Announcement/Notice No.
2025-118
Title
Approval of Business Implementation Plan and Topographic Map Announcement for Daeyeon Station Housing Redevelopment Project
Date
October 1, 2025
#DaeyeonStationHousingRedevelopmentProject, #DaeyeonStation, #NamguBusan, #DaeyeonDong, #Redevelopment, #MaintenanceProject, #HousingRedevelopmentProject, #ApprovalofBusinessImplementationPlan, #TopographicMapAnnouncement, #HanshinConstruction, #ConstructionCompanySelection, #204Units, #Apartments, #NeighborhoodLivingFacilities, #SalesPlan, #MemberSales, #GeneralSales, #TransitOrientedApartments, #ResidentialEnvironmentImprovement, #BusanRedevelopment, #NamguApartments, #UrbanMaintenance, #MaintenanceProjectStatus, #BusanRealEstate, #RedevelopmentInvestment, #ApartmentConstruction, #MaintenanceZone, #BusanNewConstruction, #BusanApartments, #LocalDevelopment
Frequently Asked Questions (FAQ)
Q. What is the date of approval for the business implementation plan of the Daeyeon Station Housing Redevelopment Project and the duration of the project?
The business implementation plan was approved on September 25, 2025, and the project duration is 48 months.
The business implementation plan for the Daeyeon Station Housing Redevelopment Project was approved on September 25, 2025. This project is expected to take place for 48 months, or roughly 4 years, from the date of approval. During this period, apartments and neighborhood living facilities will be constructed with the aim of improving the residential environment in the area of Daeyeon-dong, Nam-gu, Busan.
Q. What is the location and scale of the Daeyeon Station Housing Redevelopment Project?
Located at 371-13, Daeyeon-dong, Nam-gu, Busan, with a total area of 8,214㎡.
The project site is located at 371-13, Daeyeon-dong, Nam-gu, Busan, with a total area of 8,214㎡. This area consists of an implementation zone of 7,434㎡ and a road area of 780㎡. It is expected that two buildings of apartments and neighborhood living facilities will be established in this transit-oriented area from three underground floors to 35 above-ground floors.
Q. How is the housing supply and sales plan structured?
Out of a total of 204 units, 136 units are for general sale and 66 units are allocated to members.
The approved housing consists of a total of 204 units, distributed as 1 unit of 25㎡, 35 units of 59㎡, 99 units of 75㎡, and 69 units of 84㎡. Among these, 136 units are intended for general sale, while the remaining 66 units are allocated to members. Additionally, a neighborhood living facility with an area of 289㎡ is also planned to be constructed.
Q. Who is the construction company for the Daeyeon Station Housing Redevelopment Project, and what changes have been made compared to the initial plan?
Hanshin Construction has been selected as the construction company, and the number of units was changed from 212 to 204 units.
At the end of 2022, Hanshin Construction was selected as the construction company for the Daeyeon Station Housing Redevelopment Project. The initial plan was for 212 units, but during the approval process, the total number of units was adjusted to 204. This indicates that optimization and adjustments have been made during the project push.
Q. What are the new road establishment plans and expected benefits?
A road measuring 6m in width and 115m in length will be newly established and will be donated to the Nam-gu Office.
A new road with a width of 6m and a length of 115m is planned to be established within the project site and will be donated to the Nam-gu Office. This road is expected to facilitate vehicle access and enhance safety, significantly contributing to the improvement of the residential environment and regional value as part of the infrastructure expansion that leverages the advantages of being transit-oriented.