Yongdusan Park Public Parking Lot Closure Imminent! Changes in Urban Management Plan and Construction of New Jung-gu Office

When is the Yongdusan Park public parking lot scheduled to close? Plans for the construction of the Jung-gu Office new building

Decision (Abolition) of Urban Management Plan (Facility Parking Lot) and Topographical Map Notification, Nampo-dong, Gwangbok-dong, Parking Lot

Yongdusan Park Public Parking Lot Closure

The public parking lot located in Yongdusan Park has been designated as the site for the complex development of the Jung-gu Office new building, confirming the 'abolition of parking lot' in the urban management plan. This site spans a total area of 8,242.7㎡, including other parcels at 43-1, Daecheong-dong 1-ga, Jung-gu. Future plans are to demolish the existing public parking lot and construct the new office, a cultural and sports facility, and an underground parking lot.

Yongdusan Park Public Parking Lot Closure

Since there was no mention of a closure date in this notification, the exact point at which the Yongdusan Park parking lot will cease operations has not been determined. Jung-gu plans to complete the basic and detailed designs by 2026, with construction targeted for 2028 and completion by 2030. Therefore, the current parking lot is expected to remain operational until construction begins. However, the actual closure date will be announced separately after the demolition and construction schedule are confirmed.

Plans for Jung-gu Office New Building

The scale of the parking lot in the Jung-gu Office new building has changed during the feasibility study process. The previously introduced initial plan set the underground parking at approximately 785 spaces, but after adjustments considering soil conditions, project costs, and flow plans, it has been reduced to 505 spaces on three underground floors.

This figure represents an increase of 213 spaces over the current 292 spaces, but is a decrease compared to the initial proposal. The ground investigation showed a significant distribution of 'blue stone' bedrock below three floors underground, leading to the decision to reduce the number of parking spaces.

The final number of parking spaces will only be finalized after the detailed plans and permitting procedures are completed, and further changes may occur.

The area around Yongdusan Park is adjacent to the commercial districts of Nampo-dong and Gwangbok-dong, and parking issues are expected to arise during the construction period. Jung-gu will prepare temporary parking spaces and alternative transportation methods according to the construction schedule and provide related information to citizens.

Currently, the closure date for the public parking lot has not been confirmed, and considerations should be given to potential changes in the scale of parking spaces when the new office is built.

Plans for Jung-gu Office New Building



Notification No. 2025-22 of Jung-gu, Busan


Decision (Abolition) of Urban Management Plan (Facility: Parking Lot) and Topographical Map Notification

1. According to Articles 30 and 32 of the Act on Planning and Utilization of Land and Article 25 of the Enforcement Decree of the same Act, along with Article 8 Paragraph 2 of the Basic Act on Land Use Regulation, the urban management plan decision is hereby made along with the topographical map notification as stated below.
2. Related documents (the topographical map is available for viewing at “[http://www.eum.go.kr](http://www.eum.go.kr)” and is kept at the Jung-gu Office (Planning and Audit Office) for public access by general citizens and stakeholders.

August 13, 2025
Head of Jung-gu Office, Busan Metropolitan City

a. Report on the Decision (Abolition) of Urban Management Plan (Facility: Parking Lot)

1. Report on the Decision (Abolition) of the Parking Lot

CategoryMap Display NumberFacility NameLocationArea (㎡)Initial Decision DateRemarks
ConfirmedChangeAfter Change
Abolition-Parking Lot43-1, Daecheong-dong 1-ga, Jung-gu8,242.7Confirmed 8,242.7-

* Reason for Decision (Abolition) of Parking Lot

Map Display NumberFacility NameAbolition DetailsReason for Abolition
-Parking Lot- Abolition of Parking Lot - A = 8,242.7㎡- To promote efficient land use by abolishing the existing public parking lot for the complex development of the Yongdusan Public Parking Lot site

b. Related Maps: Omitted (same as the stored maps of the above location). End.

image
image
image


Category
Notification
Agency Category
Gu
Agency
Jung-gu
Notification Number
No. 2025-22
Title
Decision (Abolition) of Urban Management Plan (Parking Facility) and Topographical Map Notification
Date
2025-08-13

Yongdusan Public Parking Lot: 120 Daecheong-ro, Jung-gu, Busan Metropolitan City

#YongdusanPublicParkingLot, #BusanJunggu, #UrbanManagementPlanAbolition, #TopographicalMapNotification, #JungguOfficeNewBuilding, #NampoDong, #GwangbokDong, #BusanOldCity, #PublicParkingLot, #ParkingLotClosureUnconfirmed, #AvailabilityBeforeConstruction, #2028ConstructionGoal, #2030CompletionGoal, #UndergroundParking, #InitialPlan785Spaces, #DesignPlan505Spaces, #Existing292Spaces, #DetailedDesignChanges, #ParkingProblemMeasures, #TemporaryParkingSpace, #TrafficMeasures, #CommercialAreaImpact, #ComplexDevelopment, #ConstructionSchedule, #AdministrativeProcedures, #DaecheongDong, #YongdusanPark, #BusanCityNews, #ParkingInformation, #UrbanPlanning

Frequently Asked Questions (FAQ)

Q. When will the Yongdusan Park public parking lot close?
The closure date for the Yongdusan Park public parking lot has not yet been determined.

According to the urban management plan, the Yongdusan Park public parking lot is scheduled to be abolished; however, the closure time has not been explicitly mentioned in the notification. Jung-gu is working on plans for the new office building, cultural sports facility, and underground parking, targeting completion of the design by 2026, starting construction in 2028, and finishing by 2030. Therefore, the currently operating parking lot is expected to continue until construction begins. The closure date will be communicated separately once the demolition and construction schedule are finalized.

Q. How will the size of the parking lot change due to the complex development of the new Jung-gu Office?
The underground parking has been reduced from the initial 785 spaces to 505 spaces.

There are plans to create an underground parking lot in the new office complex, but the number of spaces has been reduced due to soil conditions, project costs, and flow plans. The initial plan had set it at about 785 spaces, but it has been reduced to 505 spaces on the third underground floor. This is an increase of 213 spaces compared to the existing 292 spaces but shows a decrease from the initial proposal. Due to findings from the ground investigation indicating significant bedrock distribution below the third underground floor, adjustments were made, and the final number will be confirmed after completing detailed designs and permitting processes. Further changes may still occur.

Q. How will parking issues around Yongdusan Park be addressed during the construction period?
Jung-gu plans to provide temporary parking spaces and alternative transportation options.

The commercial areas of Nampo-dong and Gwangbok-dong adjacent to Yongdusan Park are expected to face parking issues during the construction period. Hence, Jung-gu plans to secure temporary parking spaces and provide alternative transportation according to the construction schedule. Additionally, relevant information will be continuously provided to citizens to minimize inconvenience. The exact closure date for the public parking lot has not been confirmed yet, and detailed plans will be announced in the future.

أحدث أقدم