2035 Busan Old Urban Regeneration Plan: Analysis of the Business Feasibility and Investment Outlook for the Mid-rise Apartment Reconstruction Project in the Hwamyeong-Geumgok District

Notice of the 2035 Busan Metropolitan City Old Urban Area Maintenance Basic Plan (Hwamyung-Gumgok District)

The mid-rise apartment reconstruction project in Hwamyung-dong holds various investment possibilities.

Information regarding floor area ratio and timing of sales can determine the success of this project.

The project, involving Nakcheon-dae and Kolon, is expected to significantly influence the Busan apartment market.

image

The directions for the reconstruction of the Hwamyung and Gumgok districts in Busan Buk-gu have been officially announced. On April 8, 2026, Busan Metropolitan City published the ‘2035 Busan Metropolitan City Old Urban Area Maintenance Basic Plan (Hwamyung·Gumgok District)’, establishing a regulatory foundation for mid-rise apartment reconstruction. The area planned for the project is set at approximately 2.71 million square meters, with the target date set for 2035.

The main element of this plan is the floor area ratio. The standard floor area ratio reaches an average of 350%, with the second-class land use zone set at 340% and the third-class land use zone at 370%. Considering that the existing average floor area ratio is about 232%, there is room for an increase of approximately 117 percentage points.

Additionally, the market expects the floor area ratio to increase by about 10% due to public contributions. Thus, a net increase of about 90% to 100% can be expected. These changes are likely to have a positive impact on local development.

image

The scale of the maintenance target is quite large. The residential area maintenance type includes 15 zones, and a total of 31,359 households are expected to be renovated. Major complexes include Lotte Nakcheon-dae, Kolon Hanulchae, Hwamyung Kolon, Byuksan Riverside Town, Hwamyung Green, and Daewoo Ian. Thus, it can be seen that most of the existing complexes in Hwamyung-dong are included in this basic plan.

image

Like the Haeundae Green City, this notice is just the beginning. Although the basic plan has been announced with difficulty, executing the project is an entirely different issue.

According to the plan, beginning with approximately 2,500 households in the leading district, the schedule for relocation and construction is suggested for 2028, but this is only an administrative guideline. Due to the nature of integrated reconstruction, resident agreement, feasibility analysis, discussions on public contributions, and various licensing processes are complicating matters, making it likely that the actual completion of the project will take over 10 years.

Therefore, these factors must be adequately considered.

image

A cool perspective is necessary when evaluating business viability. Though the floor area ratio may increase by nearly 100%, the shared costs can be significant for various reasons.

This is due to rising construction costs, financial costs, securing infrastructure, and public contribution burdens acting concurrently. Particularly, in Hwamyung-dong, the current new apartment prices are relatively low compared to Haeundae, which may negatively impact the profit structure even if a similar type of reconstruction proceeds.

Considering these points, a cautious approach is necessary.

image

External factors also play a significant role. Additionally, large-scale new constructions in the nearby Gangseo-gu's Eco Delta City are planned, which may lead to a diversion of demand in the future. Considering the declining population trend in Busan, it may be risky to hold simple optimistic views from a long-term investment perspective. Ultimately, it is reasonable to expect that the Hwamyung-dong reconstruction project will involve more variables and a longer timeframe compared to Haeundae.

image

This notice includes plans for various urban structural reorganization beyond simple reconstruction. This includes a 15-minute city, expansion of living SOCs, a green-blue network linked to the Nakdong River, and the establishment of a future transportation system based on autonomous driving.

Thus, in the future, the market is expected to focus more on the speed of unified maintenance, conditions for public contributions, and the feasibility of the project rather than on individual complex prospects.

It is essential to approach from a long-term perspective rather than relying on unfounded expectations, and thorough review is required when entering investments.




Notice No. 2026-124 by Busan Metropolitan City


Notice of the 2035 Busan Metropolitan City Old Urban Area Maintenance Basic Plan
(Hwamyung·Gumgok District)
To enhance the urban functions and improve the living environment of the old Hwamyung and Gumgok districts, the basic maintenance plan for old urban areas has been established in accordance with the "Special Act on the Maintenance and Support of Old Urban Areas," and is hereby notified as follows according to Article 6, Paragraph 6 of the same Act.

April 8, 2026
Mayor of Busan Metropolitan City

1. Title: “2035 Busan Metropolitan City Old Urban Area Maintenance Basic Plan (Hwamyung·Gumgok District)”
2. Base Year and Target Year

CategoryBase YearTarget Year
Year20242035

3. Key Details
(a) Overview of the Plan
○ Background and Purpose of the Plan
○ Scope of the Plan

CategoryContent
Temporal Scope• Base Year: 2024 / Target Year: 2035
Spatial Scope• Old Urban Area: Hwamyung·Gumgok District (A=2,710,030.7㎡)

(b) Basic Direction of Maintenance
○ Vision and Objective of the Plan
(c) Spatial Structure Improvement Plan

Nurturing Area-specific HubsRealizing a 15-minute City
• Fostering "4 Major Urban Vitality Local Specialized Hubs" by linking to regional resources such as Gumgok Urban Advanced Industrial Complex, Broadcasting and Communication University, Busan Human Resources Development Center, Busan Fire School - Focusing on talent training, IT·Bio industry - Commercial, office centric, life education centric• Creating "15-minute Livelihood Zone" by expanding living SOC facilities and improving pedestrian environments centered around transit areas - Concentrating living SOC facilities such as education, medical, cultural, sports, and social welfare facilities within 750m of station zones - Ensuring a pleasant residential environment through pedestrian-friendly road plans and rationally securing main access points of complexes
• Establishing a "three-dimensional green-blue network" linking the Gamjeong Mountain and Nakdong River located to the west of the mountainous area, creating natural-friendly residential areas - Strengthening waterfront accessibility by establishing public pedestrian routes and cover parks to connect the Nakdong River severed by highways such as the Gyeongbu Line Railway and riverside roads• Building "Future Green Traffic City Infrastructure" where future transportation innovations realize - Establishing an environmentally friendly autonomous driving bus system powered by hydrogen and electricity to create an eco-friendly future city image - Creating small multi-transfer stations for seamless transfer between PM, buses, taxis near subway stations
Establishing Green-blue networkRealizing Future Green Traffic City

This is information about the special maintenance planned areas.

The residential area maintenance type is divided into 15, the facility maintenance type into 3, and the relocation support type into 4 areas.

These areas will contribute to regional development through maintenance and development.

Area NameTypeArea (㎡)Number of Households (units)Number of Complexes (units)Remarks
Total1,701,485.131,35937
1Residential Area Maintenance Type96,400.32,0162Byuksan Samhyeop Hansol, Gumgok Jugong 3rd
2Residential Area Maintenance Type74,876.11,1522Gumgok Hwamok, Hyopjin Taeyang
3Residential Area Maintenance Type40,920.44802Yurim 2nd, Yurim 1st
4Residential Area Maintenance Type53,093.21,3661Gumgok Jugong 8th, 9th
5Residential Area Maintenance Type74,537.41,2172Gumgok Jugong 5th, 6th
6Residential Area Maintenance Type111,867.62,0143Byuksan Riverside Town, Gyeongnam Honorsville, Hwamyung Green
7Residential Area Maintenance Type154,539.42,7293Hwamyung River Ville 2nd, Hwamyung Tranquil, Hwamyung Hanil U&I
8Residential Area Maintenance Type165,526.32,4604Hwamyung Green 1st and 2nd, Hwamyung Kolon, Green Forest
9Residential Area Maintenance Type182,289.72,9392Hwamyung Lotte Nakcheon-dae, Daewoo Ian
10Residential Area Maintenance Type66,770.81,0472Samhans Hill Park, Hyundai 1st
11Residential Area Maintenance Type66,814.81,0993Hwamyung Yurim, Daewoo Prugio, Hwamyung Green Hill
12Residential Area Maintenance Type174,417.92,6242Kolon Hanulchae 1st and 2nd
13Residential Area Maintenance Type147,946.32,6382Hyundai 2nd, Daelim Sanyang Riverside Town
14Residential Area Maintenance Type72,387.11,7801Sujeong Riverside Town
15Residential Area Maintenance Type36,070.45002Wooshin, Gukil
16Facility Maintenance Type1,017.5--Parking lot
17Facility Maintenance Type14,771.4--Plaza
18Facility Maintenance Type18,950.1--Park (Public agency site)
ARelocation Support Type27,750.21,0991Gumgok Jugong 1st
BRelocation Support Type48,818.31,4601Gumgok Jugong 2nd
CRelocation Support Type21,506.38021Gumgok Jugong 7th
DRelocation Support Type50,213.61,9371Gumgok Jugong 4th

(d) Planned Population and Standard Floor Area Ratio
○ Population Setting

• The allowable increase in population, considering the current processing and receiving capacity of infrastructure, is about 22,200.
CategoryParksElementary SchoolMiddle SchoolHigh SchoolWater Supply (Reservoir)Sewage
Possible Increase Population (people)22,41767,996104,85137,52574,951 (22,420)341,658

○ Planned Population Calculation

• The planned population is estimated to be 97,833, increasing from the current 75,416 by 22,417.
CategoryCurrent Status (2022)ChangePlan (2035)Remarks
Population (people)No. of Households (units)Population (people)No. of Households (units)Population (people)No. of Households (units)
Total75,41632,65122,4178,79397,83341,444
Special maintenance planned area69,93231,35922,4178,79392,34940,152
Outside special maintenance planned area5,4841,292--5,4841,292

○ Standard Floor Area Ratio Calculation

• The number of people per household in Busan Metropolitan City, as projected in the 2040 Busan City Basic Plan, is set at 2.3 individuals, applying the average area of common apartments from maintenance projects in Busan over the last ten years - [Supply area size] exclusive 60㎡: 60~85㎡: Over 85㎡ = 73㎡: 107㎡: 142㎡ applied - [Supply ratio] exclusive 60㎡: 60~85㎡: Over 85㎡ = 29.4%: 61.1%: 9.5% applied
CategoryCalculated ValueRemarks
Number of Households in Special Maintenance Planned Area (units)40,152
Area of Maintenance Projects in the Last 10 YearsExclusive Area60㎡ or less60~85㎡ or lessOver 85㎡
Average Supply Area (Ratio)73㎡ (29.4%)107㎡ (61.1%)142㎡ (9.5%)
Total Floor Area (㎡)4,028,384
Site Area (㎡)1,149,894
Standard Floor Area Ratio350%

(e) Infrastructure Planning
○ Necessary Infrastructure by Living Zone

• To realize the 15-minute city, analyzing the radius of major infrastructure usage around transit areas, considering higher-level and related plans, and the opinions of resident surveys, additional living SOC facilities that need to be secured for small living zones have been derived. • Living SOC facilities should be created in consultation with the relevant departments in Buk-gu and in accordance with the planning of the 15-minute city during future reconstruction projects.
Current Status of Necessary Infrastructure by 15-Minute Living Zone
CategoryGumgok Living ZoneDongwon Living ZoneYulli Living ZoneHwamyung Living ZoneSujeong Living Zone
Current Status (15-Minute City Compatible Facilities)• 3 Schools (2 Elementary, 1 Middle) • 1 Library, 1 Youth Training Center • 1 Social Welfare Facility (for the Disabled) • 1 Cultural Facility (Religious)• 2 Schools (1 Elementary, 1 Middle) • 1 Library, 1 Public Office • 1 Social Welfare Facility (Child Welfare) • 1 Youth Training Center• 8 Schools (4 Elementary, 2 Middle, 2 High) • 1 Library, 1 Sports Facility (Golf Course) • 3 Social Welfare Facilities (2 for the Elderly, 1 General Health) • 4 Public Offices (including Procurement Office)• 7 Schools (4 Elementary, 2 Middle, 1 High) • 1 Library • 1 Public Office (Park) • 1 Sports Center (Comprehensive Sports Center)• 2 Schools (1 Elementary, 1 College) • 1 Social Welfare Facility (Education, Health, and Disability Welfare)
Priority among Additional SOC Facilities1st Priority• Community Sports Facilities• Small Business Startup Support Facilities, etc.• Children's Multi-Cultural Spaces• Comprehensive Social Welfare Facilities• Community Sports Facilities
2nd Priority• Small Business Startup Support Facilities, etc.• Community Sports Facilities• Cultural Centers (Small Theaters, etc.)• Lifelong Learning Spaces• Small Business Startup Support Facilities, etc.
3rd Priority• Cultural Centers (Small Theaters, etc.), Comprehensive Social Welfare Facilities• Cultural Centers (Small Theaters, etc.), Lifelong Learning Spaces, Community Health Centers• Lifelong Learning Spaces, Community Sports Facilities, Community Health Centers, Small Business Startup Support Facilities, etc.• Children's Multi-Cultural Spaces, Community Health Centers, Youth Training Centers• Cultural Centers (Small Theaters, etc.), Community Health Centers
CategoryPriority Selection CriteriaRemarks
1st Priority• Secure supply facilities for newly influx population through maintenance projects• Reservoir expansion and parks
2nd Priority• Securing living SOC facilities for the creation of 15-minute cities - Prioritizing facilities needed for small living zones - Promoting in consultation with 15-minute city creation• Small Business Startup Support Space • Community Sports Facilities • Cultural Center (Small Theater, etc.) • Comprehensive Social Welfare Facilities • Lifelong Learning Space • Community Health Center
3rd Priority• Securing green belts and improving pedestrian environments• Cover parks • Improvement of underground passages connecting Nakdong River • Natural restoration projects (Yongdu Stream) • Vertical elevators • Underground pedestrian paths in Nakdong-Hwamyung District • Installation of priority roads for PM
4th Priority• Other conditions affecting transportation facilities• Installation of smart intersections • Installation of PM storage • Introduction of autonomous driving buses • Establishment of small multi-transfer stations

(f) Building Density Plans
○ Basic Direction

• The previous floor area ratio will apply the greater value between the floor area ratio stated in the building registry and the current district unit plan determined before the establishment of the special maintenance plan • A proper development density plan (standard floor area ratio of 350%) is prepared, considering the increase of about 22,200 people resulting from the relaxation of the floor area ratio in special maintenance planned areas - Standard floor area ratio of second-class general residential area: 340% - Standard floor area ratio of third-class general residential area: 370% • Additional infrastructure and self-sufficient facilities may apply for floor area ratio relaxation after implementing the standard floor area ratio through public contribution funds ※ To be determined through deliberation by the maintenance committee when establishing future special maintenance plans
District NumberPurpose ZoneDistrict Area (㎡)Site Area (㎡)Current Floor Area Ratio (%)District Unit Floor Area Ratio (%)Previous Floor Area Ratio (%)Standard Floor Area Ratio (%)Floor Area Ratio Increase (%)Number of Complexes (units)Remarks
Total1,666,746.11,152,925--232.62350117.38-
1Second-class General96,400.372,561219.02200.00219.02340120.982
2Second-class General74,876.146,703202.80200.00202.80340137.202
3Second-class General40,920.424,966232.25200.00232.25340107.752
4Second-class General53,093.246,756165.18200.00200.00340140.001
5Second-class General74,537.441,171183.27222.21222.21340117.792
6Second-class General111,867.674,278262.47237.33262.4734077.533
7Third-class General154,539.499,884270.86267.33270.8637099.143
8Second-class General165,526.385,872251.49249.00251.4934088.514
9Third-class General182,289.7123,711267.03269.64269.64370100.362
10Third-class General66,770.844,004290.35260.00290.3537079.652
11Third-class General66,814.841,491269.33266.84269.33370100.673
12Third-class General174,417.9112,283267.54266.00267.54370102.462
13Third-class General147,946.3113,117267.32265.28267.32370102.682
14Third-class General72,387.159,420251.02268.00268.00370102.001
15Second-class General36,070.418,420119.70200.00200.00340140.002
ASecond-class General27,750.227,750.2169.42200.00200.0027070.001Rental
BSecond-class General48,818.348,818.3133.22200.00200.0027070.001Rental
CSecond-class General21,506.321,506.3209.31220.00220.0027050.001Rental
DSecond-class General50,213.650,213.6147.91200.00200.0027070.001Rental

g. Relocation Plans
○ Estimation of Annual Relocation Demand

• There are a total of 19 zones in the special maintenance planned area within the Hwamyung·Gumgok districts where relocation demand occurs, with a total planned relocation of 31,359 households. • The relevant zones are planned to sequentially commence projects over 10 years (2028-2037), with an expected initial relocation quantity of 2,500 households for the leading district, and an average annual relocation of 2,600 households for others.
Number of special maintenance planned areasExpected Relocation HouseholdsDemolition PeriodAverage Annual Households to be PromotedAverage Annual Maintenance Complexes
1931,359 (Sale 26,061 / Rental 5,298)10 years (2028-2037)Approximately 2,600 households (excluding leading district)1-2 units (excluding leading district)

○ Estimation of Annual Relocation Demand and Supply Quantities


• Considering licenses and completions for maintenance and development projects in autonomous districts within 10km near the Hwamyung·Gumgok districts, a total of 99,600 households are projected to be supplied by 2040 - Autonomous districts within