Haeundae Vista Dongwon 2nd Sale Schedule and Details: Aerial View, Number of Units, Site Plan, News on Housing Construction Project Approval

Haeundae Vista Dongwon Phase 2 Sale Schedule, Aerial View, Number of Units, Layout, Timeline

Tentative) Aerial View of Haeundae Vista Dongwon Phase 2

A mixed-use development project being carried out at 1364-1 Jung-dong, Haeundae-gu, Busan has received housing construction business plan approval and completed the urban management plan decision and land surveying notification procedures, officially starting.

According to Notification No. 2026-25 of Busan Metropolitan City Haeundae-gu, the business plan was approved on February 13, 2026, with the implementation period set from March 31, 2026, to June 30, 2030.

Based on this timeline, it appears likely that sales will occur within the second quarter of 2026.

Tentative) Aerial View of Haeundae Vista Dongwon Phase 2

A project named 'Construction of Residential Complex at 1364-1 Jung-dong' is underway in Haeundae-gu. The project developer is Asiad Comprehensive Development Co., Ltd., and the land area totals 9,904.2㎡. The project consists of 6 underground floors and 47 above-ground floors, with a total floor area of 130,819.3471㎡.

This high-rise mixed-use complex will consist of 3 blocks, comprising 516 housing units for residential space. Additionally, 102 officetels will be provided for commercial space. The zoning is designated as a general commercial area, with a building coverage ratio limited to below 80% and a planned floor area ratio restricted to below 834%.

Tentative) Haeundae Vista Dongwon Phase 2

The market expects that a successful sale of the 'Haeundae Vista Dongwon' will lead to a high likelihood of subsequent projects, including 'Haeundae Vista Dongwon Phase 2'. The total cost of this project is approximately 876.8 billion won and is being highlighted as a landmark complex that shapes the high-rise skyline.

This project received approval from the Busan City Housing Business Joint Committee in November 2024. Subsequently, an environmental impact assessment consultation and public briefing are scheduled for 2025.

The business area has raised the need to improve the urban landscape and residential environment, mixed with existing vacant lands and old buildings.

Haeundae District Mixed-Use New Construction Project at 1364-1 Jung-dong

With the decision of the urban management plan, the new district unit plan area has been set to 10,979㎡. Along with this, a portion of the Mid-Road 3-94 has been expanded from 16m to 19m, and the Secondary Road 2-159 has been widened from 8m to 10m. Additionally, a pedestrian-only road will also be newly created.

Moreover, plans have been established for a public open space of 1,163.96㎡, and relaxation of the floor area ratio will be applied through the provision of public facility sites. This infrastructure maintenance is expected to contribute to the region's development.

Haeundae District Mixed-Use New Construction Project at 1364-1 Jung-dong

Jung-dong in Haeundae is an area densely populated with high-rise mixed-use and ultra-luxury residential facilities over 40 stories high. It is located near BEXCO, the center of Haeundae's commercial district, excellent educational zones, and various living infrastructures, making the residential environment highly favorable. Furthermore, the excellent transportation accessibility is also a significant advantage.

Particularly, since a high-rise residential complex will be built within the general commercial area, this project is recognized for its location, brand, and scale.

Due to the recent rise in construction costs and premium for the Haeundae area, the sale price is expected to be quite high. As the business plan approval is completed, future sale schedules, unit compositions, and announcements of sale prices will be significant variables in the market.




Notification No. 2026-25 of Busan Metropolitan City Haeundae-gu


Approval of housing construction business plan and determination of urban management plan (district unit planning area and district unit plan) and land surveying notification

1. The housing construction business plan for 1364-1 Jung-dong, Haeundae-gu, Busan has been approved in accordance with Article 15 of the Housing Act, and the notification is made as follows in accordance with Article 15, paragraph 6 of the same law and Article 30, paragraph 5 of the Enforcement Decree of the same law.
2. The decision concerning the urban management plan (district unit plan area and district unit plan) that is deemed to be under Article 19 of the Housing Act is notified as determined in accordance with Article 30 of the National Land Planning and Utilization Act and Article 25 of the Enforcement Decree of the same law and the land surveying notification is made in accordance with Article 32 of the National Land Planning and Utilization Act and Article 27 of the Enforcement Decree of the same law as well as Article 8 of the Basic Land Use Regulation Act and Article 7 of the Enforcement Decree of the same law.
3. Related documents are available at the Architecture Division of Haeundae-gu, Busan Metropolitan City and are accessible to the general public and interested parties; publication of relevant maps is omitted. (Land Link "http://www.eum.go.kr" is available for viewing)

February 25, 2026
Mayor of Haeundae-gu, Busan

1. Name of the project:
Construction of Residential Complex at 1364-1 Jung-dong, Haeundae-gu

2. Name/Address of the business entity
a. Name: Asiad Comprehensive Development Co., Ltd. (CEO Lee Dae-lim)
b. Address: 303, Sangga-dong, 754 Suyeong-ro, Suyeong-gu, Busan (Minrak-dong, Centum Vista Dongwon)

3. Location, area of implementation, and scale of constructed housing
a. Location: Area of 1364-1 Jung-dong, Haeundae-gu, Busan
b. Land area: 9,904.2㎡
c. Building area: 3,959.0691㎡
d. Total floor area: 130,819.3471㎡
e. Building scale: 6 basement/47 above ground floors, 3 blocks, housing unit (apartment - 516 units), commercial facilities (officetel - 102 units)
f. Use: housing (apartment) and ancillary welfare facilities, commercial facilities (officetel), neighborhood living facilities
4. Date of business plan approval:
February 13, 2026.

5. Business implementation period:
March 31, 2026 ~ June 30, 2030.

6. Matters deemed to be notified under Article 19, paragraph 1 of the Housing Act
a. Building permit under Article 11 of the Building Act
b. Urban management plan decision (district unit planning area and district unit plan) under Article 30 of the National Land Planning and Utilization Act, and development permission under Article 56 of the same law
c. Agricultural land conversion permit under Article 34 of the Agricultural Land Act


Decision of the Urban Management Plan (district unit planning area and district unit plan)
1. Decision of the Urban Management Plan (district unit planning area and district unit plan)
a. Record of determination on the district unit planning area

TypeMap Indication NumberDistrict NameLocationArea (㎡)Initial Decision DateRemarks
Previously DeterminedChangeAfter Change
Newly Established-District Unit Planning Area of 1364-1 Jung-dongArea of 1364-1 Jung-dong, Haeundae-gu-Increase to 10,97910,979--

○ Reason for Decision

Map Indication NumberLocationDecision DetailsReason for Decision
-Area of 1364-1 Jung-dongㆍNewly established district unit planning area - Area: 10,979㎡ㆍTo rationalize land use and enhance its functions by constructing residential complexes through housing construction businesses in developable land within the city, ensuring a favorable urban environment, and systematically managing it, we intend to establish and decide the district unit planning area.

○ Decision Record of Urban Management Plan regarding zoning and facility layout
1) Decision record of urban management plan regarding the subdivision of land use areas and changes between subdivided land use areas: No changes

ClassificationArea (㎡)Rate (%)Remarks
Previously DeterminedChangeAfter Change
Total10,979-10,979100.0
General Commercial AreaFire Safety Zone10,979-10,979Area within the district
ClassificationScaleFunctionLength (m)Starting PointEnd PointUsage TypeMajor PassageInitial Decision DateRemarks
GradeTypeNumberWidth (m)
Previously DeterminedMid-Road39412~19Collector Road466Woongdong 585Jung-dong (Dae 3-48)General Road-Building Notice No. 555 (1972.12.30)-
ChangeMid-Road39412~19(3)Collector Road466(48)Woongdong 585Jung-dong (Dae 3-48)General Road-Building Notice No. 555 (1972.12.30)Expansion of partial section width B=16m→19m
Previously DeterminedSecondary Road14610~13Local Road323Jung-dong 1394-393Jung-dong 1368-2General Road-Building Notice No. 555 (1972.12.30)-
ChangeSecondary Road14610~13Local Road323Jung-dong 1394-393Jung-dong 1368-2General Road-Building Notice No. 555 (1972.12.30)Change at the junction with Mid-Road 3-94
Previously DeterminedSecondary Road21598Local Road166Jung-dong 1783-2Jung-dong 1365-13General Road-Building Notice No. 555 (1972.12.30)-
ChangeSecondary Road21598~10(2)Local Road166(71)Jung-dong 1783-2Jung-dong 1365-13General Road-Building Notice No. 555 (1972.12.30)Expansion of partial section width B=8m→10m
Newly EstablishedSecondary Road2858~9Special Road48Secondary Road 2-159Secondary Road 2-4Pedestrian Road---
Newly EstablishedSecondary Road3624Local Road52Jung-dong 1716-2Jung-dong 1446-2General Road---


2) Decision Record of Urban Management Plan concerning the distribution and scale of infrastructure

※ ( ) indicates the width and extension within the district unit planning area
○ Road change reason record

Previous Road NameChanged Road NameChange DetailsReason for Change
Mid-Road 3-94Mid-Road 3-94ㆍPartial Section Width Expansion - B=16m→19mㆍTo minimize inconvenience for local residents and ensure smooth traffic flow, partial section width expansion
Secondary Road 1-46Secondary Road 1-46ㆍChange at the junction with Mid-Road 3-94ㆍTo minimize inconvenience for local residents and ensure smooth traffic flow, junction change
Secondary Road 2-159Secondary Road 2-159ㆍPartial Section Width Expansion - B=8m→10mㆍTo minimize inconvenience for local residents and ensure smooth traffic flow, partial section width expansion
-Secondary Road 2-85ㆍNew Road Establishment - B=8~9m, L=48mㆍTo ensure safe commuting for students, establishment of a pedestrian road
-Secondary Road 3-62ㆍNew Road Establishment - B=4m, L=52mㆍTo minimize inconvenience for local residents and to promote smooth communication within and outside the project area and surrounding areas, a new road is established

3) Decision Record concerning the scale and composition of households and plots

Map NumberHousehold NumberArea (㎡)PlotRemarks
Plot NumberLocationArea (㎡)
Total10,979.0--10,979.0-
-A9,904.21Within the area of 1364-1 Jung-dong9,904.2Mixed-use land
-972.0-Within the area of 1720 Jung-dong156.0Urban planning facility (Mid-Road 3-94)
-Within the area of 1376-3 Jung-dong35.0Urban planning facility (Secondary Road 1-46)
-Within the area of 1365-7 Jung-dong141.0Urban planning facility (Secondary Road 2-159)
-Within the area of 1641 Jung-dong224.0Urban planning facility (Secondary Road B)
-Within the area of 1234 Jung-dong416.0Urban planning facility (Secondary Road A)
102.8-Within the area of 1364-12 Jung-dong39.0Public facility land (road)
-Within the area of 1375-10 Jung-dong63.0Public facility land (road)
-Within the area of 1375-6 Jung-dong0.8Public facility land (road)

4) Decision Record of Urban Management Plan regarding building purposes, coverage ratio, floor area ratio, height, etc.

○ Standards for Floor Area Ratio Relaxation

LocationClassificationPlanned Content
Household NumberPlot Number
A1PurposeDesignated PurposeㆍHousing and ancillary facilities, and welfare facilities under Article 2 of the Housing Act, and commercial facilities under Article 2 of the Building Act, First and Second Class neighborhood living facilities
Prohibited PurposesㆍAny purpose other than designated
Coverage RatioㆍBelow 80%
Floor Area RatioㆍBelow 834%
HeightㆍBelow 153m
○ Standard floor area ratio up to 600% ○ Maximum floor area ratio 834.6% = 600% (standard floor area ratio) + 48.04% (reduction in coverage ratio) + 30.00% (variable structure) + 70.51% (public open space) + 86.06% (provision of public facility sites) ○ Planned floor area ratio below 834% (within maximum floor area ratio)

○ Standards for Height Relaxation

○ Standard height 95m, maximum height 120m ○ Allowed height 153.1m = 95m (standard height) + 28.50m (operational guideline Article 10 Other Matters) + 3.70m (operational guideline Article 7 Pedestrian Environment Improvement) + 20.35m (structure conducive to remodeling) + 5.57m (provision of public facilities land) ○ Planned height below 153m (within allowed height)

5) Decision record regarding other matters in the urban management plan
a) Plan regarding public open space

Map NumberLocationPlanned ContentRemarks
-A-1ㆍBoundary change of Mid-Road 3-354 and Secondary Road 2-159 to the northeast of the project site (A=1,163.96㎡)-

7. Related Maps
: Omitted (same as the material at the place of storage). End.

image
image
image
image

Classification
Notification
Agency Classification
District
Agency
Haeundae-gu
Notification/Announcement Number
2026-25
Title
Approval of Housing Construction Business Plan and Decision of Urban Management Plan (District Unit Planning Area and District Unit Plan) and Land Survey Notification
Date
February 25, 2026

1364-1 Jung-dong, Haeundae-gu: 1364-1 Jung-dong, Haeundae-gu, Busan

#HaeundaeVistaDongwon2, #HaeundaeJungdongSale, #HaeundaeNotification, #HousingConstructionBusinessApproval, #UrbanManagementPlanDecision, #LandSurveyNotification, #Jungdong1364, #HaeundaeMixedUse, #47StoryApartment, #516Units, #102Officetel, #6Basement47Floors, #HaeundaeSalesUpcoming, #2026Q2Sales, #HaeundaeLandmark, #HaeundaeCommercialArea, #FloorAreaRatio834Percent, #DistrictUnitPlanningArea, #BusanHighRiseApartment, #HaeundaeNewConstruction, #AsiadComprehensiveDevelopment, #HaeundaeSkyline, #HaeundaeRe-development, #HaeundaeResidentialMap, #PublicOpenSpacePlan, #RoadExpansion, #BusanApartmentSale, #HaeundaeRealEstate, #HaeundaeJungdongDevelopment, #BusanNotification


Frequently Asked Questions (FAQ)

Q. When is the sale schedule for Haeundae Vista Dongwon Phase 2?
The sale of Haeundae Vista Dongwon Phase 2 is scheduled to take place within the second quarter of 2026.

The Haeundae Vista Dongwon Phase 2 project, being conducted at 1364-1 Jung-dong, Haeundae-gu, Busan, has received approval for the housing construction business plan, and the project will commence from March 31, 2026. Accordingly, the sale schedule is very likely to occur within the second quarter of 2026. Specific sale dates, floor layouts, and price announcements will be disclosed later.

Q. How many units does Haeundae Vista Dongwon Phase 2 comprise?
This complex consists of 516 housing units and 102 officetel units.

The Haeundae Vista Dongwon Phase 2 project is a high-rise mixed-use complex consisting of 3 blocks, spanning from 6 basement floors to 47 above ground floors. It will include a total of 516 housing units and 102 officetel units, with a land area of approximately 9,904.2㎡ and a total floor area of about 130,819㎡. This will provide large-scale combined residential and business spaces.

Q. Who is the primary implementation company for this project?
The developer is Asiad Comprehensive Development Co., Ltd.

The main implementing entity for the Haeundae Vista Dongwon Phase 2 project is Asiad Comprehensive Development Co., Ltd., led by CEO Lee Dae-lim. The company is located at 303, Sangga-dong, 754 Suyeong-ro, Suyeong-gu, Busan (Minrak-dong, Centum Vista Dongwon). The expertise and reliability of the developer are important factors that enhance the likelihood of success for the project.

Q. What are the urban management plans and infrastructure maintenance related to this project?
Infrastructure such as road width expansion and the establishment of pedestrian-only roads will be maintained.

Along with the Haeundae Vista Dongwon Phase 2 project, the urban management plan has set the district unit planning area at 10,979㎡. The Mid-Road 3-94 will be expanded from 16m to 19m, while the Secondary Road 2-159 will be widened from 8m to 10m. Additionally, a pedestrian-only road will be newly created, and plans for a public open space of 1,163.96㎡ will be put in place, allowing the relaxation of the floor area ratio through the provision of public facility sites. This infrastructure improvement is expected to contribute to regional development and home environment enhancement.

Q. What are the locational advantages of Haeundae Vista Dongwon Phase 2?
It is situated in the center of Haeundae Jung-dong, with excellent infrastructure and transportation accessibility.

The Jung-dong area of Haeundae is well known as a residential area adjacent to BEXCO, the central business district of Haeundae, excellent educational facilities, and diverse living infrastructure. The concentrated high-rise mixed-use and luxury residential facilities offer a very favorable location, and the outstanding transportation accessibility is also a significant benefit.

Particularly, the fact that a high-rise residential mixed-use complex will be established within the general commercial area positions the Haeundae Vista Dongwon Phase 2 project with great competitiveness in terms of both brand and scale.

다음 이전