On June 26, 2025, the Busan Metropolitan City Architectural Committee made significant decisions during its 8th meeting.

During this session, the 'Hope More Apartment' located at Beomcheondong 858-6 and the 'Hope More Housing' at Oncheondong 1447-11 were conditionally approved, and these projects will commence supplemental work. Additionally, the 'Gyo-dae Station Hanyang Plaza Mixed-Use Complex' located at Geojeongdong 129-5 and the 'Eomeong 1st District Housing Redevelopment' in Sasang-gu Eomeongdong 412 also received conditional approval. Following compliance with additional design and construction conditions, these projects are expected to enter the formal construction process.

The projects discussed here are located in Beomcheondong, Oncheondong, Geojeongdong, and Eomeongdong and are expected to play a crucial role in local development. These construction activities have great potential to lead to improvements in Busan's residential environment and invigorate the local economy.




Construction of Hope More Apartment in Beomcheondong - Busanjin-gu Beomcheondong 858-6

Construction of Hope More Apartment in Beomcheondong - Busanjin-gu Beomcheondong 858-6

The Busan Metropolitan City Architectural Committee conditionally approved the construction of the 'Hope More Apartment' at Beomcheondong 858-6 and surrounding sites on June 26, 2025. This project is led by Korea Land Trust Co., Ltd., and is located in a general commercial area and fire protection zone, as well as areas with maximum height limits by street zones.

The total site area is 6,481.10㎡, designed with 6 basement floors and 49 above-ground floors, reaching a maximum height of 167.1m. This apartment complex includes two buildings consisting of multi-family housing, business facilities, and neighborhood living facilities. The total floor area is planned to be 115,727.037㎡, with a building coverage ratio of 63.88% and a floor area ratio of 1,293.19%.

Construction of Hope More Apartment in Beomcheondong - Busanjin-gu Beomcheondong 858-6

The committee set conditions to ensure the safety of the structure, including a steel bridge, rooftop solar structures, and separate casting of TG beams. Additionally, measures to prevent sinkhole occurrences due to changes in groundwater levels and additional testing and management consulting for the load-bearing capacity of the field-cast piles were required. Before construction begins, documentation regarding the renewable energy replacement rate due to elevated energy efficiency ratings must also be submitted.

The Hope More Apartment in Beomcheondong is one of the pilot projects of Busan City's youth housing policy 'Hope More Housing', with rental fees set below 75% of market prices. The city plans to establish a total of 4,812 units across 16 locations by June 2025 and has stated its intention to expand project sites and simplify procedures for designating development areas through regulatory relaxation.


Construction of Hope More Apartment in Beomcheondong - Busanjin-gu Beomcheondong 858-6


Builder
: Korea Land Trust Co., Ltd.
Site Status
:
Location: 858-6 Beomcheondong, Busanjin-gu, Busan and 7 surrounding lots
Site Area: 6,481.10㎡
Land Use Zone: General Commercial Area, Fire Protection Zone, Maximum Height Limitation Areas by Street
Building Status
:
Building Area: 4,139.8774㎡
Building Coverage Ratio: 63.88%
Floors: 6 basement/49 above ground
Main Use: Multi-family Housing (Apartment), Business Facilities, Neighborhood Living Facilities
Structure: Reinforced Concrete
Number of Buildings: 2
Maximum Height: 167.1m
Floor Area Ratio: 1,293.19%
Total Floor Area: 115,727.037㎡
Review Result
: Conditional Approval

Shinheung Industrial: 858-6 Beomcheondong, Busan Metropolitan City
Construction of Hope More Apartment in Beomcheondong - Busanjin-gu Beomcheondong 858-6

Construction of Hope More Housing in Oncheondong - Dongnae-gu Oncheondong 1447-11

Construction of Hope More Housing in Oncheondong - Dongnae-gu Oncheondong 1447-11

The Busan Metropolitan City Architectural Committee conditionally approved the construction of the 'Hope More Housing' located at Oncheondong 1447-11, Dongnae-gu on June 26, 2025. The project is managed by Korea Asset Trust Co., Ltd. and is located in a general commercial area, fire protection zone, and an area with maximum height limits per street.

The planned building consists of 1 basement floor and 28 above-ground floors, reaching a maximum height of 99.1m and a total floor area of 38,752.11㎡. The building coverage ratio is set at 75.10%, and the floor area ratio is 1,277.26%.

The committee proposed several conditions to ensure structural safety. These include reinforcing the detailed design of dampers and reviewing the addition of rebar at the bottom of beams when casting TG beams separately. Additionally, if weak ground is found, ground replacement must be conducted, and construction times must consider rainy and cold periods to prevent poor workmanship. Furthermore, the committee required adjustments to measurement devices and installation of X-bracing under the construction plate to strengthen measurement management.

The project site is within a 3-minute walk from Minam Station on the urban subway lines 3 and 4, making public transportation very accessible. Additionally, essential convenience facilities are concentrated nearby, increasing its attractiveness as a residential area. The Hope More Housing will be rented at 75% below market prices for youth and newlyweds, with private developers managing construction and rentals while the city provides financial support and regulates approvals.

This project was conditionally approved during the 3rd Architectural Committee meeting held on February 20. Recently, additional proposals on structural and ground reinforcement were made during the review. Consequently, there is an increasing need to modify and implement detailed designs before construction commencement. If these conditions are met, approximately 292 rental apartments in a transit-oriented area are expected to be supplied, helping stabilize housing for the youth.


Construction of Hope More Housing in Oncheondong - Dongnae-gu Oncheondong 1447-11


Builder
: Korea Asset Trust Co., Ltd.
Site Status
:
Location: 1447-11 Oncheondong, Dongnae-gu, Busan (Related lots: 1447-2, 2, 4, 6, 7, 9, 10, 13, 14, 20)
Site Area: 2,899.20㎡
Land Use Zone: General Commercial Area, Fire Protection Zone, Maximum Height Limitation Areas by Street
Building Status
:
Building Area: 2,177.41㎡
Building Coverage Ratio: 75.10%
Floors: 1 basement / 28 above ground
Main Use: Multi-family Housing
Structure: Reinforced Concrete
Number of Buildings: 1
Maximum Height: 99.10m
Floor Area Ratio: 1,277.26%
Total Floor Area: 38,752.11㎡
Review Result
: Conditional Approval

Oncheondong 1447-11: Busan Metropolitan City Dongnae-gu Oncheondong 1447-11
Construction of Hope More Housing in Oncheondong - Dongnae-gu Oncheondong 1447-11



Construction of the Mixed-Use Complex at Geojeongdong Hanyang Plaza - Yeonje-gu Geojeongdong 129-5

Construction of the Mixed-Use Complex at Geojeongdong Hanyang Plaza - Yeonje-gu Geojeongdong 129-5

On May 19, 2025, the Busan Metropolitan City Architectural Committee conditionally approved the 'Gyo-dae Station Hanyang Plaza Mixed-Use Construction Project' located in Geojeongdong 129-5. The project's implementing company is BS Asset Management Co., Ltd., and the area is in a district planning and semi-residential area. The planned building consists of 4 basement floors and 44 above-ground floors, with a maximum height of 143.1m. The building area is 3,379.6181㎡ with a coverage ratio of 43.78%, a floor area ratio of 671.91%, and a total floor area of 75,974.7256㎡.

The committee additionally required detailed structural designs for transfer plates, transfer mats, and rooftop solar structures. It also mandated load testing for EnP files and further evaluation of the supporting capacity of weathered rock. Once construction begins, it will be necessary to ensure safety timelines and re-evaluate the construction period, and plans addressing groundwater level fluctuations and a management consulting team for measurements were also proposed as conditions. These procedures are expected to contribute to the stability and efficiency of future projects.

Construction of the Mixed-Use Complex at Geojeongdong Hanyang Plaza - Yeonje-gu Geojeongdong 129-5

The area has been set up for mixed development, including more than 5% of commercial and business ratios, following the 'Gyo-dae Station 2 Semi-Residential Mixed District Plan' announced on December 27, 2023.

The distance from Gyo-dae Station on Line 1 is about 183m, accessible within about 3 minutes on foot, making public transportation very convenient. Moreover, Suan Station and Dongnae Station are also within 1km, making transportation conditions excellent.


If the project successfully starts construction, the site near Kyo-dae Station will transform into a residential and commercial complex with 390 units rising 44 floors high. This is expected to change the local skyline and partially alleviate residential demand in transit-oriented areas.

Construction of the Mixed-Use Complex at Geojeongdong Hanyang Plaza - Yeonje-gu Geojeongdong 129-5


Builder
: BS Asset Management Co., Ltd.
Site Status
:
Location: 129-5 Geojeongdong, Yeonje-gu, Busan
Site Area: 7,719㎡
Land Use Zone: District Planning Area, Semi-Residential Area
Building Status
:
Building Area: 3,379.6181㎡
Building Coverage Ratio: 43.78%
Floors: 4 basement/44 above ground
Main Use: Multi-family Housing
Structure: Reinforced Concrete
Number of Buildings: 2
Maximum Height: 143.10m
Floor Area Ratio: 671.91%
Total Floor Area: 75,974.7256㎡
Review Result
: Conditional Approval

Geojeongdong 129-5: Busan Metropolitan City Yeonje-gu Myungryun-ro 3
Construction of the Mixed-Use Complex at Geojeongdong Hanyang Plaza - Yeonje-gu Geojeongdong 129-5



Eomeong 1st District Redevelopment Project - Sasang-gu Eomeongdong 412

Eomeong 1st District Redevelopment Project - Sasang-gu Eomeongdong 412

On June 26, 2025, the Busan Metropolitan City Architectural Committee conditionally approved the Eomeong 1st District Housing Redevelopment Project located at Eomeongdong 412 in Sasang-gu. This project plans to construct 13 multi-family housing buildings with a site area of 67,186㎡, consisting of 5 basement floors and 36 above-ground floors.

The building will have a maximum height of 103.45m, a coverage ratio of 16.39%, and a floor area ratio of 261.32%. The total floor area is expected to reach 289,856.1352㎡, signifying significant changes in the local housing environment.

The committee required confirmation of whether wastewater and stormwater pipes intersect and their slopes during construction. Furthermore, after constructing the underground parking lot, it is necessary to estimate the required time per process for PHC piles and conduct simulations of fire door locks.

It also emphasized the need for review concerning interference between temporary facilities and foundations. Additionally, drainage system design for landslide-prone layers and timing adjustments for constructing the retaining wall, along with checking the safety of excavations and conducting CCTV and 3D GPR surveys in the excavation impact area were proposed as conditions.


The project is set to consist of 1,670 units of apartments and various auxiliary facilities and will be constructed by Kolon Global. The management association held a general meeting last year to change the management disposition plan, applying a floor area ratio of 256.6% and coverage ratio of 16.39%, completing the approval process. Recently, the construction costs with the contractor have increased to 506.7 billion won.

If the conditions are met and construction begins, it will establish itself as the largest redevelopment complex in the western Busan area, expected to greatly contribute to transforming the local skyline and meeting housing demand.

Eomeong 1st District Redevelopment Project - Sasang-gu Eomeongdong 412


Builder
: Eomeong 1st District Housing Redevelopment Management Association
Site Status
:
Location: Eomeongdong 412, Sasang-gu, Busan
Site Area: 67,186.00㎡
Land Use Zone: 3rd Class General Residential Area
Building Status
:
Building Area: 11,014.3527㎡
Coverage Ratio: 16.39%
Floors: 5 basement / 36 above ground
Main Use: Multi-family Housing
Structure: Reinforced Concrete
Number of Buildings: 13
Maximum Height: 103.45m
Floor Area Ratio: 261.32%
Total Floor Area: 289,856.1352㎡
Review Result
: Conditional Approval

Eomeong 1 Housing Redevelopment: Eomeongdong, Sasang-gu, Busan Metropolitan City

Eomeong 1st District Redevelopment Project - Sasang-gu Eomeongdong 412



#Beomcheondong858_6, #HopeMoreApartment, #Busanjin-guRedevelopment, #49StoryApartment, #ArchitecturalCommitteeConditional, #Oncheondong1447_11, #HopeMoreHousing, #Dongnae-guYouthHousing, #28StoryMultiHousing, #ScheduledForCompletion, #Geojeongdong129_5, #GyoDaeStationHanyangPlaza, #MixedUseComplex, #44StoryTower, #GyoDaeStation2DistrictPlan, #YeonjeDistrict, #Eomeongdong412, #Eomeong1DistrictRedevelopment, #Sasang-gu, #36StoryApartment, #LargeScaleRedevelopment, #BusanArchitecturalReview, #NewandRenewableEnergy, #StructuralSafetyReview, #EcoFriendlyConstruction, #BusanResidentialMaintenance, #UrbanRedevelopment, #TransitOrientedHousing, #BusanApartmentSales, #SkylineChange


Frequently Asked Questions (FAQ)

Q. What are the major projects reviewed by the Busan City Architectural Committee on June 26, 2025?
Hope More Apartment in Beomcheondong, Hope More Housing in Oncheondong, Gyo-dae Station Hanyang Plaza Mixed-Use in Geojeongdong, and Eomeong 1st District Redevelopment were conditionally approved.

In the 8th meeting of the Busan City Architectural Committee on June 26, 2025, projects such as the Hope More Apartment in Beomcheondong and the Hope More Housing in Oncheondong, Gyo-dae Station Hanyang Plaza Mixed-Use in Geojeongdong, and Eomeong 1st District Housing Redevelopment Project in Sasang-gu were conditionally approved. These projects will commence construction processes after compliance with additional design modifications and construction conditions. The projects in Beomcheondong and Oncheondong are models for youth rental housing, while those in Geojeongdong and Eomeongdong are large-scale mixed-use and redevelopment projects.

Q. What are the main design and review conditions for the construction of Hope More Apartment in Beomcheondong?
Construction of 2 buildings with 6 basement and 49 above-ground floors, conditions for structural safety such as a steel bridge, etc.

The Hope More Apartment in Beomcheondong has a total site area of 6,481.10㎡, comprising 6 basement floors and 49 above-ground floors, with a total floor area of 115,727㎡ and a maximum height of 167.1m. The building consists of multi-family housing, business facilities, and neighborhood living facilities. The committee proposed conditions such as a steel bridge, rooftop solar structures, separate casting of TG beams, measures to address changes in groundwater levels, and additional testing and measurement management consultations. Additionally, the submission of data regarding the renewable energy replacement rate due to increases in energy efficiency ratings was also required.

Q. What is the location and characteristics of the Hope More Housing project in Oncheondong?
Located at 1447-11 Oncheondong, Dongnae-gu, comprising 1 basement and 28 above-ground floors with 292 units, a transit-oriented youth rental housing.

The Hope More Housing in Oncheondong is located at 1447-11 Oncheondong, Dongnae-gu, just a 3-minute walk from Minam Station on urban subway lines 3 and 4, boasting excellent transport accessibility. The design includes 1 basement floor and 28 above-ground floors with a coverage ratio of 75.10% and a floor area ratio of 1,277.26%, with a total floor area of 38,752㎡. Conditions for structural safety include reinforcement of damper designs, ground substitution, and enhanced measurement management, and it will be developed as a rental housing model below 75% of market prices for youth and newlyweds.

Q. What are the main details and review conditions of the Gyo-dae Station Hanyang Plaza Mixed-Use project in Geojeongdong?
Expected to construct a mixed-use building with 44 floors and 390 units, detailed structural design improvements and safety measures were required.

The Gyo-dae Station Hanyang Plaza Mixed-Use is located at 129-5 Geojeongdong in Yeonje-gu and is planned to consist of 4 basement floors and 44 above-ground floors with a maximum height of 143.1m and a total floor area of 75,974㎡. It includes a plan for commercial and business facilities and is situated about a 3-minute walk from Gyo-dae Station. The architectural committee suggested detailed structural improvements for transfer plates, transfer mats, rooftop solar structures, and required response plans for changes in groundwater levels, along with operating a measurement management consulting group.

Q. What is the scale of the Eomeong 1st District Housing Redevelopment and the major conditions proposed by the Architectural Committee?
Conditionally approved for construction of underground 5 floors and above-ground 36 floors with 1,670 units on an area of 67,186㎡ in Sasang-gu.

The Eomeong 1st District Redevelopment is planned for an area of 67,186㎡ in Eomeongdong 412 with 13 buildings, aiming for a total of 1,670 units with 5 basement floors and 36 above-ground floors. It has a coverage ratio of 16.39%, a floor area ratio of 261.32%, and a projected total floor area of 289,856㎡, expected to become the largest redevelopment site in western Busan. The committee proposed conditions for confirming wastewater and stormwater pipe intersections, estimating PHC pile processing times, conducting simulations of fire doors, reviewing interference between temporary facilities and foundations, designing drainage systems for landslide-prone layers, adjusting construction times for retaining walls, and conducting safety inspections for excavations as well as implementing CCTV and 3D GPR surveys in the excavation impact area.